Twin Clarifiers - Bundamba

Client: Theiss, Black & Veatch Joint Venture

Project Value: Approximately $700k

Contract Type: Supply, Manufacture, Sandblasting & Painting, Delivery

Timeline: 3 Weeks

Description: 2 x Twin Clarifier Tanks

The Twin Clarifiers being prepared in the WorkshopThe Twin Clarifiers being prepared in the Workshop On the truck, ready for the journey to siteOn the truck, ready for the journey to site Leaving the yard, on specially adapted trucksLeaving the yard, on specially adapted trucks


Project Objectives

One of the most challenging  projects undertaken by Maxcon Industries was the design, manufacture, and installation of the ‘Bundamba Twins’ (as they became known) for Bundamba WWTP.

This project came about as Ipswich City Council devised a scheme to conserve potable water during a particularly severe drought in 2009/2010. Potable Water that was currently servicing the Power Station at Swan Bank would be now recycled water from the Bundamba WWTP, instead of the drinking water that had been servicing the station until then, in order to conserve the drinking water levels within the town.  

Swanbank Power Station will be using recycled water from Bundamba WWTP for cooling and for the demineralisation plant, thus reducing the use of potable water in the industrial sector.

Scope of Works

Maxcon Industries were asked to supply, manufacture, blast and paint two Clarifier tanks for Black & Vetch.

Special Considerations

The upgrade was part of the drought mitigation and the tanks were required to be manufactured and installed within a tight 3 week program.

Operation levels of the workshop were increased to 24 hours a day to ensure the project was delivered on time. 

Fabrication

The two Clarifier Tanks were manufactured in Maxcon Industries’ specialist workshop at Ipswich, west of Brisbane.

The facility was able to manufacture both vessels simultaneously. Due to the size of the workshop, the Clarifiers were sheltered from adverse weather conditions, ensuring weld preparation and fabrication could be controlled and thus guaranteeing the highest quality finished product within the specified timeframe.

Delivery

The two Clarifiers were transported by two special low axle trucks for the journey. The trucks were required to ensure clearance under low obstacles.

At time of delivery, there were only two trucks in the entire country that were capable of transporting such massive structures and both of them were needed to complete the delivery to Bundamba.

Although the logistics were challenging, there were no delays or damage during the journey to Bundamba WWTP. 

  

Case Studies Listing

Package Treatment Plant

Case Studies

Package Treatment Plant

Client: Bechtel Australia Pty Ltd / BMA Project Value: Approximately $1.2 M Contract Type: Manufacture, Sandblasting & Painting, Delivery Timeline: 18 months Description: Package Water & Waste Water Treatment Plants    Project Objectives When BMA received approval to develop its Cavill Ridge mine project it appointed Bechtel as the Engineering... Read more

Digester Roofs - Coombabah

Case Studies

Digester Roofs - Coombabah

Client: Bechtel Australia Pty Ltd / BMA Project Value: Approximately $1.2 M Contract Type: Manufacture, Sandblasting & Painting, Delivery Timeline: 18 months Description: Package Water & Waste Water Treatment Plants    Project Objectives Maxcon Industries was contracted by Abigroup to design, manufacture and install two roofs for Anerobic Digesters. The roofs were... Read more

Twin Clarifiers - Bundamba

Case Studies

Twin Clarifiers - Bundamba

Client: Theiss, Black & Veatch Joint Venture Project Value: Approximately $700k Contract Type: Supply, Manufacture, Sandblasting & Painting, Delivery Timeline: 3 Weeks Description: 2 x Twin Clarifier Tanks    Project Objectives One of the most challenging  projects undertaken by Maxcon Industries was the design, manufacture, and installation of the ‘Bundamba Twins’ (as... Read more

Westbury Pipeline

Case Studies

Westbury Pipeline

Client: Cryeng Group Pty Ltd / BOC Limited Project Value: Approximately $1.8 M Contract Type: Manufacture, Testing, Sandblasting & Coating, Delivery Timeline: 14 months Description: 2 x 300,000L Cryogenic Vessels    Project Objectives BOC identified a site in Westbury Tasmania as the ideal location for a gas pipeline and the place for... Read more

Vacuum Insulated Pipes

Case Studies

Vacuum Insulated Pipes

Client: Bechtel Oil, Gas Chemical (QCLNG + APLNG) Project Value:  Contract Type: Supply, Manufacture, Sandblasting & Painting, Delivery Timeline: 24 Months Description: 8.0 Km Vacuum Insulated Pipe 6" to 60" Diameter    Project Objectives Maxcon Industries was contracted by Cryeng Group Pty Ltd (who was awarded the project by Bechtel Oil... Read more

Painting and Sand Blasting

Case Studies

Painting and Sand Blasting

Location: Blast room 1 and Paint Bays 1-4, Ipswich Blasting Capacity: Class 3 Blast with 60um Profile Painting Capacity: 18 metres W, 90 metres L, 10 metres H Description: State-of-the-Art Coating and Sand Blasting Facility     Workshop Facilities The factory complex has a floor area of approximately three thousand square... Read more