Client: Cryeng Group Pty Ltd / BOC Limited Project Value: Approximately $1.8 M Contract Type: Manufacture, Testing, Sandblasting & Coating, Delivery Timeline: 14 months Description: 2 x 300,000L Cryogenic Vessels |
|
Project ObjectivesBOC identified a site in Westbury Tasmania as the ideal location for a gas pipeline and the place for Australia’s first Micro LNG plant. The Facility sources natural gas and converts it into liquid gas for heavy vehicles. Two Cryogenic Vessels, supplied by Maxcon Industries, stores the LNG post treatment. Maxcon Industries provided 2 x 300,000 Litre vertical storage pressure vessels which store the gas prior to being delivered to various sites around Tasmania. At full capacity the site produces 50 tonnes of LNG per day. Scope of WorksMaxcon Industries was engaged to procure, manufacture, project manage, test and paint two cryogenic vessels. Maxcon Industries secured the order due to its high level of experience in manufacturing cryogenic vessels and our ability to source professional and well-priced transport.Special ConsiderationsThe vertical LNG storage vessels once erected, are 27 m high and 4.6 m diameter. The vessels are vacuum insulated to restrict vaporising by ambient heating. ASME welding standards were adhered to to ensure that the two vessels were fabricated to the highest international standards. FabricationThe two 300,000 L pressure vessels were manufactured in Maxcon Industries specialist Cryogenic manufacturing facility at Ipswich west of Brisbane. The facility has the capacity to manufacture both vessels simultaneously. Workshop 2 in Ipswich has the capacity to protect the vessels from adverse weather conditions, ensuring weld preparation and fabrication can be controlled, guaranteeing the highest quality finished product. Delivery |
Case Studies
Client: Bechtel Australia Pty Ltd / BMA Project Value: Approximately $1.2 M Contract Type: Manufacture, Sandblasting & Painting, Delivery Timeline: 18 months Description: Package Water & Waste Water Treatment Plants Project Objectives When BMA received approval to develop its Cavill Ridge mine project it appointed Bechtel as the Engineering... Read more
Case Studies
Client: Bechtel Australia Pty Ltd / BMA Project Value: Approximately $1.2 M Contract Type: Manufacture, Sandblasting & Painting, Delivery Timeline: 18 months Description: Package Water & Waste Water Treatment Plants Project Objectives Maxcon Industries was contracted by Abigroup to design, manufacture and install two roofs for Anerobic Digesters. The roofs were... Read more
Case Studies
Client: Theiss, Black & Veatch Joint Venture Project Value: Approximately $700k Contract Type: Supply, Manufacture, Sandblasting & Painting, Delivery Timeline: 3 Weeks Description: 2 x Twin Clarifier Tanks Project Objectives One of the most challenging projects undertaken by Maxcon Industries was the design, manufacture, and installation of the ‘Bundamba Twins’ (as... Read more
Case Studies
Client: Cryeng Group Pty Ltd / BOC Limited Project Value: Approximately $1.8 M Contract Type: Manufacture, Testing, Sandblasting & Coating, Delivery Timeline: 14 months Description: 2 x 300,000L Cryogenic Vessels Project Objectives BOC identified a site in Westbury Tasmania as the ideal location for a gas pipeline and the place for... Read more
Case Studies
Client: Bechtel Oil, Gas Chemical (QCLNG + APLNG) Project Value: Contract Type: Supply, Manufacture, Sandblasting & Painting, Delivery Timeline: 24 Months Description: 8.0 Km Vacuum Insulated Pipe 6" to 60" Diameter Project Objectives Maxcon Industries was contracted by Cryeng Group Pty Ltd (who was awarded the project by Bechtel Oil... Read more
Case Studies
Location: Blast room 1 and Paint Bays 1-4, Ipswich Blasting Capacity: Class 3 Blast with 60um Profile Painting Capacity: 18 metres W, 90 metres L, 10 metres H Description: State-of-the-Art Coating and Sand Blasting Facility Workshop Facilities The factory complex has a floor area of approximately three thousand square... Read more